For Concrete Crushing Ppt

The cost of formwork is considered as 20 to 25 of the cost of the structure in building work it may be higher than this in bridgesIn order to reduce the cost of form it is necessary to design economical types of formwork and to mechanize its construction We should have to remove the form work when concrete has reached a suitable strength.

Contact Us

High and New Industrial Zone, Kexue Revenue, Zhengzhou, China

[email protected]